I have the same issues at work as a Program manager.....schedules always seem to slip to the right.... But rarely to the left.
My whaler project took a year to complete.
My point is that he has an extremely aggressive schedule layed out and without a lot of money up front, aggressive schedules tend to slip to the right.
After the boat is together and motor is installed....only then will the Gremlins raise their pesky little heads.......