Getting Ready

TBendCondor

New member
Well, after much reading and studying. Have the water system figured out. Have a T-Valve coming this week, along with a new fuel line for the new Carb.
About all i have to do now is rewire the bilge pumps so the key doesnt have to be on to make them work.
Wife and I are planning on going to our camp on Toledo the end of this month and trying it out!
 
Top